how to lift and unload atmospheric storage tank (part 2)
for example, the storage tank (especially the larger storage tank) will be installed in the customer's location, the following factors should be considered before installation:
the first factor to be considered is that the site of the tank should be compact, easy to operate and close to the liquid delivery point.
there should be solid soil conditions to prevent the equipment from being damaged during installation and storage, and the foundation of the storage place must be kept away from the drainage ditch.
if the storage tank is placed outdoors, the storage tank and related equipment (if any) shall not be exposed or in the environment of damaged power supply flammable liquid pipeline or flammable gas pipeline.
site preparation
considerations for site preparation include selection of suitable foundation. before foundation fabrication, it may be necessary to remove all organic matter and topsoil. cement mat is the most common foundation, and storage tanks are placed on the mat. the floor mat is a stable and permanent storage place for the device and any other auxiliary facilities (such as reserve gas cylinders, vaporizers, etc.) equipped on the same site. the foundation or foundation structure of the cement floor mat should be solid, which is also very important. a layer of stones or crushed stones should be laid under the foundation.
it is suggested that a local qualified engineer should recommend a kind of mat design, which should meet the local and national requirements and regulations on soil and climate conditions and local earthquake.
protection of place of placement
in most cases, the tank is vulnerable to damage, which may be caused by unauthorized personnel operation, other equipment moving into the area where the tank is located, or both. due to external exposure, railings or supports should be used for protection.
other points for attention
the installation of the tank shall be carried out under the supervision of personnel familiar with the structure and use of the tank.
according to the installation requirements, all on-site pipelines and connections connected with the storage tank shall be pressure tested (according to the air tightness test pressure equal to the design pressure) to check for leakage.
prev: 135、how to lift and unload atmospheric storage tank
next: 180、function and overview of air heated carburetor - doer equipment
news
- 204. brief introduction to tank development - doer … [2022-10-31]
- 204、lng vacuum cryogenic liquid storage tank - doe… [2022-10-31]
- 203、precautions for precooling of natural gas stor… [2022-10-28]
- 203、preparation before pressure regulation of lng … [2022-10-24]
- 3,successful test run of cangzhou ethylene storage… [2019-09-02]
- 2,advantages of suzhou doer large cryogenic tank … [2019-08-30]
- 1,congratulations on the success of one-time liqui… [2019-08-26]