203、preparation before pressure regulation of lng tank-威尼斯2299

 203、preparation before pressure regulation of lng tank-威尼斯2299

welcome to"suzhou doer gas & chemical equipment co., ltd" website!

hotline: 86 512-81666096
0512-66182570

hotline

86 512-81666096
industry

now:home > news > industry

203、preparation before pressure regulation of lng tank- doer equipment

classification:industry publishtime:2022-10-24 13:13:55

preparation before pressure regulation of lng tank- doer equipment

1. preparation of tools
two sets of explosion-proof adjustable wrenches, gloves and protective equipment.

2. work preparation
(1) wear labor protection appliances, including anti-static clothing, static shoes, helmets, etc;
(2) check whether mobile phones, computers and other devices that are easy to cause static electricity have been placed in a safe area, and check whether the surrounding environment is safe and meets the operating conditions;
(3) before entering the station, touch the electrostatic touch release facility with both hands to release static electricity;
(4) check whether the explosion-proof wrench and other pressure regulating tools are complete;
(5) check whether the pressure gauge, level gauge, thermometer, combustible gas detector and safety valve of the storage tank are in normal working condition.
(6) check whether the pipeline valves, pressure gauges and safety valves are in normal working condition.
(7) prepare all explosion-proof tools


home product case
网站地图